Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'A1A ' (1) ·
'COURTENAY PARKWAY ' (1) ·
'EB PGA Blvd. ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'LINTON BLVD. ' (1) ·
'Old Dixie Hwy. ' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR A1A ' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-44 ' (1) ·
'SR-A1A ' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'US-1 SB ' (1) ·
'WB PGA Blvd. ' (1) ·
'WB Spanish River ' (1) ·
SR-A1A SB (1)
700030 (1) ·
700117 (1) ·
700210 (1) ·
703004 (1) ·
790004 (1) ·
790172 (1) ·
794016 (1) ·
890003 (1) ·
890066 (1) ·
930060 (1) ·
930106 (1) ·
930154 (1) ·
930226 (1) ·
930322 (1) ·
930349 (1) ·
930547 (1) ·
940045 (1) ·
940082 (1)
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'200' East of US-1(SR-5) ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'8.6 MILES SOUTH OF US 1 ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'US-1 SB over FECRR ' (1) ·
'WB SR800.2Mi west of US-1' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)