Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Barge Canal ' (1) ·
'Boynton Inlet ' (1) ·
'BRANCH OF ICWW ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'MIAMI CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'TEN MILE CREEK ' (1) ·
'WPB CANAL C-51 ' (1)
'Atlantic Avenue ' (1) ·
'Banana River Drive' (1) ·
'CORKSCREW BLVD. ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'CR-717 ' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'E/B S.R. 704 ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'JUPITER ISLAND PK ' (1) ·
'NW 2ND ST ' (1) ·
'NW 5TH STREET ' (1) ·
'SR A1A ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-3 ' (1) ·
'SR-80 ' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'SUMMIT BLVD ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB SR 802 Lake Ave' (1) ·
'WOOLBRIGHT ROAD ' (1)
700072 (1) ·
700201 (1) ·
704063 (1) ·
890107 (1) ·
930026 (1) ·
930029 (1) ·
930030 (1) ·
930056 (1) ·
930061 (1) ·
930064 (1) ·
930072 (1) ·
930104 (1) ·
930214 (1) ·
930318 (1) ·
930338 (1) ·
930360 (1) ·
930506 (1) ·
930507 (1) ·
934126 (1) ·
934160 (1) ·
934161 (1) ·
934201 (1) ·
934502 (1) ·
940015 (1) ·
940072 (1)
'.2mi East of US-27 ' (1) ·
'0.25MI E OF US 1 ' (1) ·
'0.2MI S OF EDWARDS RD ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'500FT WEST OF I-95 ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'At East Canal St. ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'SR-3 SB over Barge Canal ' (1)
26274181 (1) ·
26282666 (1) ·
26305220 (1) ·
26324386 (1) ·
26365544 (1) ·
26365576 (1) ·
26395130 (1) ·
26395767 (1) ·
26411023 (1) ·
26411370 (1) ·
26411885 (1) ·
26413511 (1) ·
26421986 (1) ·
26422200 (1) ·
26525465 (1) ·
26525529 (1) ·
26562485 (1) ·
26570930 (1) ·
27035280 (1) ·
27240944 (1) ·
27241547 (1) ·
28085715 (1) ·
28242777 (1) ·
28242782 (1)
80022882 (1) ·
80023594 (1) ·
80024000 (1) ·
80024618 (1) ·
80025300 (1) ·
80032041 (1) ·
80034367 (1) ·
80035127 (1) ·
80040991 (1) ·
80040992 (1) ·
80041914 (1) ·
80042609 (1) ·
80044370 (1) ·
80072029 (1) ·
80215950 (1) ·
80235220 (1) ·
80362216 (1) ·
80400416 (1) ·
80401144 (1) ·
80402235 (1) ·
80422088 (1) ·
80422154 (1) ·
80424470 (1) ·
80424695 (1) ·
80482588 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)