Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'CR 702 45th Street ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'L-5 Canal ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'Northlake Blvd. ' (1) ·
'Seaboard Coastline RR ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'Turkey Creek ' (1) ·
'WPB Drainage Canal ' (1)
'BEL LIDO DRIVE ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR603(JOHNSTON RD)' (1) ·
'Entrnce Rd to FDOT' (1) ·
'French Avenue ' (1) ·
'GLADES CUTOFF ' (1) ·
'HURON WAY ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Levee Road ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'Old Samsula Dr ' (1) ·
'RDBGH RD 170.14 ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'TAYLOR DAIRY ROAD ' (1)
704019 (1) ·
794006 (1) ·
794020 (1) ·
894019 (1) ·
894021 (1) ·
894048 (1) ·
930294 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930540 (1) ·
930802 (1) ·
930803 (1) ·
930804 (1) ·
935507 (1) ·
935900 (1) ·
940041 (1) ·
940060 (1) ·
940069 (1) ·
940071 (1)
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.3 mi North of Taylor Rd' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'2 miles West of US-17 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200ft. W of A1A ' (1) ·
'3.4 MI S INDIAN RIVER CO ' (1) ·
'5.2MI S of CR-712 ' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'Between SR 710 and 786 ' (1) ·
'I-95 / SR 882 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)