Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'E-3 Canal ' (1) ·
'Eau Gallie River ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'Elbow Creek ' (1) ·
'Frazier Creek ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'Kellers Canal ' (1) ·
'LWDD E-3 Canal ' (1) ·
'LWDD E-4 Canal ' (1) ·
'SR 60 ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'Tillman Canal ' (1)
'CRESTWOOD BLVD. ' (1) ·
'Gateway Blvd. ' (1) ·
'Hypoluxo Rd ' (1) ·
'Indiantown Rd. ' (1) ·
'Linton Blvd. ' (1) ·
'MARINA BLVD. ' (1) ·
'Minton Road CR-509' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-5 (US-1) ' (1) ·
'SR-808 Glades Road' (1) ·
'SR802 (Lake Worth)' (1) ·
'US-1 ' (1) ·
'Woolbright Road ' (1)
700007 (1) ·
700008 (1) ·
704075 (1) ·
880102 (1) ·
890002 (1) ·
930015 (1) ·
930073 (1) ·
930301 (1) ·
930307 (1) ·
930325 (1) ·
930391 (1) ·
934296 (1) ·
934363 (1) ·
934924 (1) ·
934944 (1) ·
934986 (1) ·
940102 (1)
'.4mi. East of Congress ' (1) ·
'.5 mi East of I-95 ' (1) ·
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.5 Mile West of I-95 ' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'I 95 Exit 56 ' (1) ·
'I-95 over SR-60 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-5 S of Roosevelt BR ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)