Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Eau Gallie River ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'Apollo Boulevard ' (1) ·
'Becker Road ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'Crosstown Parkway ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'SW 15TH AVE ' (1)
705604 (1) ·
880077 (1) ·
884056 (1) ·
930373 (1) ·
930386 (1) ·
930387 (1) ·
931001 (1) ·
931006 (1) ·
934293 (1) ·
934461 (1) ·
937715 (1) ·
940160 (1) ·
940161 (1)
'.75 miles South of SR-882' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'250ft North of SR-60 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'South of Ramp to SR 706 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.