Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'CANAL C-17 ' (1) ·
'E-2W Canal ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'LWDD L30 Canal ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'Palmetto Park Road ' (1) ·
'South Relief Canal ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'ST. LUCIE RIVER ' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1) ·
'WB SR 80 ' (1)
'Benoist Farms Rd ' (1) ·
'CR605 Old Dixie ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'EB SR 704 ' (1) ·
'EB SR 786 ' (1) ·
'Hagen Ranch Road ' (1) ·
'HATTON HIGHWAY ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'LYONS ROAD ' (1) ·
'NB SR 807 ' (1) ·
'PARK AVE. W. ' (1) ·
'Peninsula Corp Dr ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'SB SR 807 ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'W/B Atlantic Ave ' (1)
790196 (1) ·
790197 (1) ·
884086 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930210 (1) ·
930367 (1) ·
930381 (1) ·
930419 (1) ·
930440 (1) ·
930442 (1) ·
930450 (1) ·
930475 (1) ·
930476 (1) ·
930491 (1) ·
930532 (1) ·
930533 (1) ·
934164 (1) ·
934553 (1) ·
934711 (1) ·
934731 (1) ·
934958 (1) ·
944011 (1)
'.5mi East US1 Lakeworth ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.2MI S OF US-98 ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1st overpass east of I-95' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Boca Raton ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1)
26203900 (1) ·
26210275 (1) ·
26222805 (1) ·
26251444 (1) ·
26271450 (1) ·
26290179 (1) ·
26383900 (1) ·
26403485 (1) ·
26403530 (1) ·
26403721 (1) ·
26403812 (1) ·
26404400 (1) ·
26404575 (1) ·
26422136 (1) ·
26470110 (1) ·
26475062 (1) ·
26503600 (1) ·
26525829 (1) ·
26525885 (1) ·
27192572 (1) ·
27361500 (1) ·
28500676 (1) ·
28500808 (1)
80030866 (1) ·
80043390 (1) ·
80045427 (1) ·
80045433 (1) ·
80045945 (1) ·
80045990 (1) ·
80052450 (1) ·
80052546 (1) ·
80054600 (1) ·
80070410 (1) ·
80070450 (1) ·
80070535 (1) ·
80075174 (1) ·
80075197 (1) ·
80094882 (1) ·
80101517 (1) ·
80102700 (1) ·
80102980 (1) ·
80110316 (1) ·
80200618 (1) ·
80231300 (1) ·
80325180 (1) ·
81190878 (1) ·
81191063 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.