Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF C-44 CANAL ' (1) ·
'C-23 CANAL ' (1) ·
'COLLIER CREEK ' (1) ·
'CSX RAILROAD ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'L-10 Canal ' (1) ·
'LK OSBORNE DR& CENTER DR' (1) ·
'LK OSBORNE DR&CENTER DR ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'POPPELTON CREEK ' (1) ·
'RELIEF CANAL ' (1) ·
'SFWMD C-15 CANAL ' (1) ·
'SR-518 ' (1)
'6TH AVE SO. EB ' (1) ·
'6TH AVE SO. WB ' (1) ·
'BARBER STREET ' (1) ·
'BRANT DR/CARL BOTT' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'CR714 PALM CITY RD' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'I-4 EB ' (1) ·
'I-95 NB ' (1) ·
'LE CHALET BLVD ' (1) ·
'Levee Road ' (1) ·
'MARINA BLVD. ' (1) ·
'MURPHY RD ' (1) ·
'PLM BEACH LAKES BL' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SW 18TH ST ' (1)
700122 (1) ·
790107 (1) ·
884053 (1) ·
884055 (1) ·
884065 (1) ·
885605 (1) ·
890015 (1) ·
890039 (1) ·
894003 (1) ·
894019 (1) ·
930805 (1) ·
934302 (1) ·
934307 (1) ·
934487 (1) ·
934943 (1) ·
934944 (1) ·
935218 (1) ·
935501 (1) ·
937709 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.3MI S OF SR-60 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.6MI W OF I-95 ' (1) ·
'0.6MI WEST OF I-95 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1/2MI S of US-1 ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'300FT East of CR-717 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-95 NB SR-518 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.