Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Banana River Relief East' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Gabordy's Canal ' (1) ·
'Gatlin Blvd ' (1) ·
'Halifax Canal ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'I-95 ' (1) ·
'Indian River ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR-442 ' (1) ·
'SR-513 ' (1) ·
'SR-524 ' (1) ·
'Tomoka River ' (1)
'Center Avenue ' (1) ·
'Citrus Blvd ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'DUDA ROAD ' (1) ·
'Hull Road ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I-4 WB ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'Riverside Drive ' (1) ·
'SAVONA BLVD. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-528 ' (1)
700054 (1) ·
700081 (1) ·
700082 (1) ·
700083 (1) ·
700115 (1) ·
700129 (1) ·
700143 (1) ·
700148 (1) ·
790022 (1) ·
790063 (1) ·
790077 (1) ·
790078 (1) ·
790079 (1) ·
795521 (1) ·
795713 (1) ·
885601 (1) ·
930335 (1) ·
930336 (1) ·
934516 (1) ·
934519 (1) ·
940035 (1) ·
940108 (1) ·
945256 (1)
'0.5MI N of GATLIN BLVD. ' (1) ·
'1.0MI E OF BANANA RIV DR ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1MI W of US-1 ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'200ft. S of 10th Street ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At Intersection w LPGA BL' (1) ·
'Citrus Blvd - I-95 ' (1) ·
'Hull Road - I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 NB over SR-442 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 EB-Banana River ' (1) ·
'SR-404 WB - Banana River ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-404 WB-Banana River ' (1)
26400360 (1) ·
26401808 (1) ·
26502240 (1) ·
26502290 (1) ·
27155288 (1) ·
27161021 (1) ·
27222772 (1) ·
27453074 (1) ·
28122256 (1) ·
28123758 (1) ·
28124312 (1) ·
28124379 (1) ·
28124610 (1) ·
28222787 (1) ·
28241828 (1) ·
28252942 (1) ·
28570264 (1) ·
29001931 (1) ·
29091985 (1) ·
29143174 (1) ·
29154558 (1) ·
29154580 (1) ·
29162634 (1)
80060655 (1) ·
80060720 (1) ·
80203293 (1) ·
80231068 (1) ·
80252110 (1) ·
80290638 (1) ·
80362348 (1) ·
80371385 (1) ·
80371403 (1) ·
80374130 (1) ·
80381684 (1) ·
80384625 (1) ·
80390039 (1) ·
80481590 (1) ·
80491320 (1) ·
80491520 (1) ·
80544173 (1) ·
80570125 (1) ·
81030053 (1) ·
81043246 (1) ·
81070414 (1) ·
81070520 (1) ·
81071887 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.