Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12124 (1) ·
12127 (1) ·
12152 (1) ·
12154 (1) ·
12181 (1) ·
12205 (1) ·
12207 (1) ·
13796 (1) ·
13797 (1) ·
15143 (1) ·
15145 (1) ·
15146 (1) ·
15147 (1) ·
15150 (1) ·
15151 (1) ·
15152 (1) ·
15176 (1) ·
15630 (1) ·
15879 (1) ·
15977 (1) ·
16027 (1) ·
17870 (1) ·
19163 (1) ·
19164 (1) ·
19367 (1) ·
19500 (1)
'Banana River Relief ' (1) ·
'Banana River Relief East' (1) ·
'Banana River Relief West' (1) ·
'Indian River Relief ' (1) ·
'KELLER (E-4) CANAL ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'OUTFALL CANAL ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'RELIEF CANAL ' (1) ·
'Relief E.of North Bridge' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
'St Johns River Relief ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1) ·
St Johns River Relief (1)
'2nd AVENUE NORTH ' (1) ·
'AVENUE OF PGA ' (1) ·
'BROWNS FARM/CR-827' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-528 ' (1) ·
'SR-A1A ' (1) ·
'SR510 Wabasso Road' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 NB TPK 175.4 ' (1) ·
'SR91 NB TPK 178.03' (1) ·
'SR91 NB TPK 180.16' (1) ·
'SR91 NB TPK 189.1 ' (1) ·
'SR91 SB TPK 175.4 ' (1) ·
'SR91 SB TPK 178.03' (1) ·
'SR91 SB TPK 180.16' (1) ·
'SR91 SB TPK 189.1 ' (1) ·
'US-192 WB ' (1) ·
'Volco Road ' (1) ·
US-192 EB (1)
700023 (1) ·
700027 (1) ·
700080 (1) ·
700082 (1) ·
700114 (1) ·
700146 (1) ·
700148 (1) ·
700213 (1) ·
794131 (1) ·
794133 (1) ·
880052 (1) ·
880057 (1) ·
880058 (1) ·
880059 (1) ·
880060 (1) ·
880065 (1) ·
880066 (1) ·
880067 (1) ·
880068 (1) ·
884055 (1) ·
930235 (1) ·
930241 (1) ·
934364 (1) ·
934518 (1) ·
937005 (1) ·
940046 (1)
'0.1 MI S of PGA BLVD ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.5Mi E of SR807 Congress' (1) ·
'0.5Mi East of US-1 ' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'1.8 MI N OF ST LUCIE CNTY' (1) ·
'13 MI S OF SR 60 ' (1) ·
'13 MI SOUTH OF SR 60 ' (1) ·
'15 MI S OF SR 60 ' (1) ·
'15 MI SOUTH OF SR 60 ' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'A1A East of Ft. Pierce ' (1) ·
'SR-404 EB-Banana Riv Rel ' (1) ·
'SR-404 EB-Banana River ' (1) ·
'SR-404 WB-Banana River ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
US-192 EB-St Johns Relief (1)
26320076 (1) ·
26370900 (1) ·
26450626 (1) ·
26501040 (1) ·
26571548 (1) ·
27284570 (1) ·
27333342 (1) ·
27333344 (1) ·
27333350 (1) ·
27333412 (1) ·
27333414 (1) ·
27333415 (1) ·
27385917 (1) ·
27385953 (1) ·
27413662 (1) ·
27451178 (1) ·
28052963 (1) ·
28053027 (1) ·
28123224 (1) ·
28123289 (1) ·
28124312 (1) ·
28124379 (1) ·
28241822 (1) ·
28241880 (1) ·
28543436 (1) ·
28544228 (1)
80045781 (1) ·
80071574 (1) ·
80080366 (1) ·
80095581 (1) ·
80184630 (1) ·
80254429 (1) ·
80264603 (1) ·
80293882 (1) ·
80371385 (1) ·
80371403 (1) ·
80380201 (1) ·
80380233 (1) ·
80393043 (1) ·
80393049 (1) ·
80410794 (1) ·
80410799 (1) ·
80434234 (1) ·
80434242 (1) ·
80454646 (1) ·
80454647 (1) ·
80454965 (1) ·
80454978 (1) ·
80513039 (1) ·
80513106 (1) ·
80543046 (1) ·
80544759 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 26 results in range #1 to #26.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)