Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'C-51 Canal ' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR-520 ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'St Johns River Relief ' (1)
700023 (1) ·
700052 (1) ·
790042 (1) ·
790100 (1) ·
930015 (1) ·
930172 (1) ·
930173 (1) ·
930261 (1) ·
930262 (1) ·
930273 (1) ·
934221 (1) ·
934295 (1) ·
934297 (1) ·
934929 (1)
'0.75 mile South of SR 708' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'AT US-441 SR-7 ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'US-192 WB-St Johns Relief' (1)
106500 (1) ·
116000 (1) ·
16000 (1) ·
190500 (1) ·
23000 (1) ·
36500 (1) ·
4400 (1) ·
500 (1) ·
5000 (1) ·
55000 (1) ·
57500 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
184778 (1) ·
201260 (1) ·
27760 (1) ·
330518 (1) ·
39905 (1) ·
600 (1) ·
6000 (1) ·
63328 (1) ·
7634 (1) ·
95425 (1) ·
99763 (1)
Showing below up to 14 results in range #1 to #14.