Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River Drive ' (1) ·
'Banana River Relief ' (1) ·
'Banana River Relief West' (1) ·
'C-17 Canal ' (1) ·
'Canal ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'Nav. Banana River Canal ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR-3 ' (1) ·
'Sykes Creek ' (1)
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'EB Blue Heron Blvd' (1) ·
'Girard Blvd. ' (1) ·
'I 95 SR 9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Patti Drive ' (1) ·
'Richland Ave ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 710 ' (1) ·
'SR A1A ' (1) ·
'SR-404 EB ' (1) ·
'SR-520 ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'Sykes Creek Pkwy ' (1) ·
'WB Blue Heron Blvd' (1)
700017 (1) ·
700026 (1) ·
700027 (1) ·
700111 (1) ·
700113 (1) ·
700114 (1) ·
700146 (1) ·
700193 (1) ·
700221 (1) ·
704011 (1) ·
704013 (1) ·
704016 (1) ·
704017 (1) ·
930172 (1) ·
930173 (1) ·
930269 (1) ·
930467 (1) ·
930468 (1) ·
930519 (1) ·
930534 (1) ·
934155 (1) ·
934156 (1)
'.8 Mile North of SR-520 ' (1) ·
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.75 mile South of SR 708' (1) ·
'1 Mile East of I-95 ' (1) ·
'15ft. N of Pine Island Dr' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'At Exit 76 ' (1) ·
'SR-404 EB-Banana Riv Rel ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-528 EB - Indian River ' (1) ·
'SR-528 EB over SR-3 ' (1) ·
'SR-528 WB over SR-3 ' (1)
26455824 (1) ·
26455826 (1) ·
26461200 (1) ·
26461850 (1) ·
26461960 (1) ·
26465833 (1) ·
26465867 (1) ·
26465903 (1) ·
26465960 (1) ·
28123224 (1) ·
28212603 (1) ·
28220616 (1) ·
28220892 (1) ·
28233806 (1) ·
28240920 (1) ·
28241813 (1) ·
28241822 (1) ·
28241870 (1) ·
28241877 (1) ·
28241880 (1) ·
28241933 (1) ·
28293415 (1)
80025351 (1) ·
80051706 (1) ·
80051771 (1) ·
80052832 (1) ·
80053013 (1) ·
80053100 (1) ·
80054560 (1) ·
80054725 (1) ·
80055680 (1) ·
80380201 (1) ·
80393043 (1) ·
80393049 (1) ·
80394904 (1) ·
80394909 (1) ·
80401219 (1) ·
80404702 (1) ·
80405551 (1) ·
80413508 (1) ·
80422075 (1) ·
80422081 (1) ·
80425652 (1) ·
80440500 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)