Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BEL LIDO DRIVE ' (1) ·
'CONGRESS AVE SB ' (1) ·
'Hypoluxo Rd ' (1) ·
'Hypoluxo to SB I95' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'Lantana to I 95 SB' (1) ·
'SB I 95 to Lantana' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1)
930274 (1) ·
930275 (1) ·
930276 (1) ·
930298 (1) ·
930299 (1) ·
930307 (1) ·
931002 (1) ·
931003 (1) ·
934331 (1) ·
934341 (1) ·
934342 (1) ·
935900 (1)
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'200ft. W of A1A ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Lantana I 95 Interchange ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.