Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'Blue Lake Equalizer ' (1) ·
'BRANCH OF ICWW ' (1) ·
'Canal ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'Cow Creek ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'Halifax River ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'M CANAL ' (1) ·
'MOORES CREEK ' (1) ·
'Nav. Banana River Canal ' (1) ·
'SFWMD L-13 CANAL ' (1) ·
'TAYLOR CREEK ' (1)
'CONGRESS AVE ' (1) ·
'CONGRESS AVE SB ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-700 ' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'E. Minnesota Ave. ' (1) ·
'Entrnce Rd to FDOT' (1) ·
'Girard Blvd. ' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'JUPITER BEACH RD ' (1) ·
'Magnolia Avenue ' (1) ·
'Maytown Road ' (1) ·
'RANGE LINERD CR609' (1) ·
'SE HARBOR ISLAND ' (1) ·
'STAR ISLAND WAY ' (1) ·
'SW 23RD AVE. ' (1) ·
'TAYLOR DAIRY ROAD ' (1)
704016 (1) ·
704019 (1) ·
794014 (1) ·
794015 (1) ·
794032 (1) ·
894017 (1) ·
894018 (1) ·
894021 (1) ·
930085 (1) ·
930302 (1) ·
934125 (1) ·
934258 (1) ·
934931 (1) ·
940020 (1) ·
940026 (1) ·
940029 (1) ·
940041 (1)
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.2 Mi East of US-1 ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'2.5Mi W of US-1 ' (1) ·
'50ft. East of Fiske Blvd ' (1) ·
'8.3 miles East of SR-415 ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'INT. OF CR-700 & CR-880 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)