Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF INDIAN RIVER ' (1) ·
'C-51 Canal ' (1) ·
'Canal C-51 ' (1) ·
'E-1 Canal ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'L-19 Canal ' (1) ·
'L-5 Canal ' (1) ·
'L-8 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'Little Haw Swamp ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'S-5 Discharge Canal ' (1)
790800 (1) ·
895501 (1) ·
930801 (1) ·
930802 (1) ·
930803 (1) ·
930804 (1) ·
930805 (1) ·
930806 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
930811 (1) ·
934301 (1) ·
935920 (1) ·
936262 (1) ·
936263 (1) ·
936264 (1) ·
936550 (1)
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'100FT Eof SEWALLS PT. RD.' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'Lake George Conservation ' (1) ·
'South Side of US-98 ' (1) ·
'StriblingWay ovr E-1canal' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.