Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service On 042a:
Highway - Pedestrian
& Kind 043a:
Prestressed concrete
& Length 049:
18
Use the filters below to narrow your results.
'E-1 CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal ' (1) ·
'Lateral C Canal ' (1) ·
'Lateral H Canal ' (1) ·
'LWDD E- 2W CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD E1 CANAL ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'SLOUGH ' (1)
'53rd Street ' (1) ·
'CLINT MOORE RD EB ' (1) ·
'CLINT MOORE RD WB ' (1) ·
'CLINT MOORE RD. EB' (1) ·
'CLINT MOORE RD. WB' (1) ·
'EB Lake Worth Rd. ' (1) ·
'INDIANTOWN RD. ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'Spanish River Blvd' (1) ·
'SW 15TH AVE ' (1) ·
'VIA DELRAY BLVD ' (1) ·
'WB Lake Worth Rd. ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1) ·
'YAMATO RD ' (1)
884076 (1) ·
884083 (1) ·
930328 (1) ·
930329 (1) ·
934144 (1) ·
934420 (1) ·
934421 (1) ·
934427 (1) ·
934461 (1) ·
934468 (1) ·
934469 (1) ·
934922 (1) ·
934923 (1) ·
934924 (1) ·
934928 (1) ·
934966 (1) ·
934967 (1) ·
934968 (1) ·
934969 (1) ·
935222 (1)
'0.2MI W OF I-95 ' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W OF MILITARY TRAIL' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'1.9 Mi E of US-441 ' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'PALMETTO PK RD US-441 SR7' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)