Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'CANAL E-2-E(BOYN BC INT)' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'E-2W CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'Hypoluxo Road ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'L-19 Canal ' (1) ·
'Lantana Road ' (1) ·
'Little Haw Swamp ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'RIO MAR BAY ' (1) ·
'S-5 Discharge Canal ' (1) ·
'SR-528 ' (1) ·
'Turnbull Creek ' (1)
'CENTRL PK BL S WB' (1) ·
'EBSR80 to SBSR807 ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'Hypoluxo to SB I95' (1) ·
'Lantana to I 95 SB' (1) ·
'Levee Road ' (1) ·
'NBSR807 to EBSR80 ' (1) ·
'SBSR807 to EBSR80 ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR-407 NB ' (1) ·
'SR91 NB TPK 86.69 ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB OFF RP81.9' (1) ·
'SR91 SB ON RP 81.9' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
'SR91 SB TPK 87.213' (1) ·
'Truck Trail #12 ' (1) ·
'Turnbull Bay Road ' (1) ·
'VETERANS WALK ' (1)
700085 (1) ·
790800 (1) ·
794022 (1) ·
885808 (1) ·
930274 (1) ·
930298 (1) ·
930429 (1) ·
930430 (1) ·
930431 (1) ·
930432 (1) ·
930472 (1) ·
930473 (1) ·
930474 (1) ·
930526 (1) ·
930805 (1) ·
930806 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
930811 (1) ·
931007 (1) ·
931008 (1) ·
934921 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.25 MI N OF ATLANTIC AVE' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'AT US-441 SR-7 ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'Lake George Conservation ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-407 NB at SR-528 WB ' (1)
26211635 (1) ·
26270705 (1) ·
26272575 (1) ·
26272647 (1) ·
26284041 (1) ·
26290520 (1) ·
26312802 (1) ·
26313526 (1) ·
26313548 (1) ·
26315179 (1) ·
26341790 (1) ·
26342300 (1) ·
26351210 (1) ·
26354162 (1) ·
26403435 (1) ·
26403445 (1) ·
26403501 (1) ·
26455204 (1) ·
26484825 (1) ·
26504915 (1) ·
27385354 (1) ·
28270757 (1) ·
29030413 (1) ·
29153934 (1)
80041025 (1) ·
80041145 (1) ·
80045890 (1) ·
80051470 (1) ·
80054615 (1) ·
80054787 (1) ·
8005960 (1) ·
80101974 (1) ·
80101977 (1) ·
80102271 (1) ·
80102293 (1) ·
80103398 (1) ·
80103466 (1) ·
80121056 (1) ·
80220390 (1) ·
80295638 (1) ·
80334956 (1) ·
80391185 (1) ·
80423700 (1) ·
80423874 (1) ·
80492277 (1) ·
80522877 (1) ·
80573537 (1) ·
81211913 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)