Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 CANAL ' (1) ·
'CSX RR ' (1) ·
'E-1 Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'I 95 SR 9 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'WPB STUB CANAL ' (1)
'BELVEDERE RD ' (1) ·
'E Gateway Blvd ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'I 95 SR 9 ' (1) ·
'JOG ROAD ' (1) ·
'Lake Worth Road ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PALMETTO PK RD ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-808 Glades Road' (1) ·
'SR91 N/S TPK 86.95' (1)
930015 (1) ·
930251 (1) ·
930325 (1) ·
930401 (1) ·
930413 (1) ·
930428 (1) ·
930433 (1) ·
930434 (1) ·
934208 (1) ·
934213 (1) ·
934273 (1) ·
934327 (1) ·
934902 (1) ·
934924 (1) ·
940101 (1)
'0.1MI W OF I-95 ' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
107570 (1) ·
157712 (1) ·
300155 (1) ·
50848 (1) ·
51387 (1) ·
52917 (1) ·
58990 (1) ·
62283 (1) ·
68532 (1) ·
69400 (1) ·
70268 (1) ·
78075 (1) ·
85015 (1) ·
99763 (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)