Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'Bulow Creek ' (1) ·
'C-51 CANAL ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'Conners Canal ' (1) ·
'CYPRESS CREEK ' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'Goat Creek ' (1) ·
'Halifax River ' (1) ·
'Lake Ashby Canal ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'Main Relief Canal ' (1) ·
'Rose Bay Canal ' (1) ·
'WILLOUGHBY CREEK ' (1)
'27th Street ' (1) ·
'FLYING COW ROAD ' (1) ·
'INDIAN STREET ' (1) ·
'ISLAND WAY ' (1) ·
'Main Street ' (1) ·
'Maytown Road ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'Orange Avenue ' (1) ·
'PALMWOOD ROAD ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'SR-44 ' (1) ·
'Tadlock Ave. ' (1) ·
'Walter Boardman Ln' (1)
704191 (1) ·
790149 (1) ·
790150 (1) ·
794120 (1) ·
794122 (1) ·
794126 (1) ·
794139 (1) ·
794141 (1) ·
884077 (1) ·
894040 (1) ·
894044 (1) ·
934136 (1) ·
934292 (1) ·
934934 (1) ·
934935 (1) ·
944012 (1)
'0.1MI N of DONALD ROSS RD' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'4.8 miles East of SR-415 ' (1) ·
'AT SR-80 ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 - Conners Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)