Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'BUCCANEER CANAL ' (1) ·
'BUTTERFLY CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'CAMINO CANAL ' (1) ·
'FECRR ' (1) ·
'FISHTAIL CANAL ' (1) ·
'GARDEN CANAL ' (1) ·
'KRUEGER CREEK ' (1) ·
'Lake Worth Tide Relief' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'Lateral A Canal ' (1) ·
'WEST PALM BEACH CANAL ' (1)
700012 (1) ·
884084 (1) ·
890112 (1) ·
890120 (1) ·
930098 (1) ·
930334 (1) ·
934116 (1) ·
935201 (1) ·
935202 (1) ·
935203 (1) ·
935204 (1) ·
935205 (1) ·
937704 (1)
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.25mi W of S.R.-A1A ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'2MI E of SR-76 ' (1) ·
'650FT E OF AUSTRALIAN AVE' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'US-1 - FECRR ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.