Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'BUCCANEER CANAL ' (1) ·
'BUTTERFLY CANAL ' (1) ·
'CAMINO CANAL ' (1) ·
'Daytona Canal ' (1) ·
'Drainage Canal ' (1) ·
'FISHTAIL CANAL ' (1) ·
'GARDEN CANAL ' (1) ·
'L-30 CANAL ' (1) ·
'Lake Worth Tide Relief' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'MOORES CREEK ' (1) ·
'Reed Canal ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'36TH STREET ' (1) ·
'Ballough Street ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-708 ' (1) ·
'CYPRESS WAY ' (1) ·
'DATE PALM RD ' (1) ·
'DATE PALM ROAD ' (1) ·
'Lantern Park Drive' (1) ·
'MILITARY TRAIL SB ' (1) ·
'MURPHY RD ' (1) ·
'NORTH 2ND STREET ' (1) ·
'Oak Lea Drive ' (1) ·
'SR80(SouthernBlvd)' (1)
795000 (1) ·
796548 (1) ·
796549 (1) ·
890112 (1) ·
894064 (1) ·
930098 (1) ·
934332 (1) ·
934936 (1) ·
935201 (1) ·
935202 (1) ·
935203 (1) ·
935204 (1) ·
935205 (1) ·
937704 (1) ·
945000 (1)
'.3 mi South of Mason Ave ' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.25mi W of S.R.-A1A ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'1.7 Miles West of I-95 ' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'650FT E OF AUSTRALIAN AVE' (1) ·
'CR-4078 & Lantern Park Dr' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 15 results in range #1 to #15.