Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'DITCH NO. 46 ' (1) ·
'EARMAN RIVER CANAL C-17 ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL C CANAL ' (1) ·
'LATERAL CANAL C ' (1) ·
'LATERAL CANAL D ' (1) ·
'LATERAL CANAL D ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SEBASTIAN RIVER PRONG ' (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'4TH STREET ' (1) ·
'53RD STREET ' (1) ·
'74TH AVE. ' (1) ·
'8TH ST. CR-612 ' (1) ·
'90TH AVE ' (1) ·
'97 TH STREET ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-512 ' (1) ·
'CR5A OLD DIXIE HWY' (1) ·
'HOLLY DRIVE ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MAC ARTHUR BLVD ' (1)
880041 (1) ·
880062 (1) ·
880063 (1) ·
884003 (1) ·
884016 (1) ·
884019 (1) ·
884022 (1) ·
884023 (1) ·
884024 (1) ·
884036 (1) ·
884063 (1) ·
884064 (1) ·
937000 (1) ·
937001 (1) ·
937002 (1)
'0.1 MI S of LIGHTHOUSE DR' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1 MI N OF SR-60 ' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'3.6 Miles West Of US-1 ' (1) ·
'AT 141st ST ' (1) ·
'AT 4TH STREET ' (1) ·
'AT 74TH AVE. ' (1) ·
'AT CR-615 (66TH AVE.) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)