Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Kind 043a :
Prestressed concrete continuous or
Steel continuous
& Superstructure 059:
Very Good
Use the filters below to narrow your results.
'Belvedere Rd to SB I-95 ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I 95 SR 9 ' (1) ·
'Indian River / ICW ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Okeechobee Waterway ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'SR-91 N/S TPK ' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
'St. Lucie River ' (1) ·
'St.Lucie River ' (1)
'Australian Ave. ' (1) ·
'Congress Avenue ' (1) ·
'CR-714 Indian St. ' (1) ·
'E/B S.R. A1A ' (1) ·
'EB 706 To SB I-95 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR-732 -Jensen Bch' (1) ·
'SR786 WB to SB I95' (1) ·
'SR91 On/Off Rmp106' (1) ·
'W/B S.R. A1A ' (1)
890145 (1) ·
890158 (1) ·
890160 (1) ·
894062 (1) ·
930384 (1) ·
930388 (1) ·
930457 (1) ·
930459 (1) ·
930477 (1) ·
930478 (1) ·
930481 (1) ·
930484 (1) ·
930488 (1) ·
930489 (1) ·
930525 (1) ·
930528 (1) ·
930529 (1) ·
931011 (1)
'.5mi E. of Indian R Dr. ' (1) ·
'0.1 MI West of SR-76 ' (1) ·
'0.25 mi N of Belvedere Rd' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'3mi East of SR5 on A1A ' (1) ·
'Between SR704 and 12th St' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'North of P. Beach Airport' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
125788 (1) ·
130993 (1) ·
137065 (1) ·
14921 (1) ·
198658 (1) ·
21688 (1) ·
22555 (1) ·
23596 (1) ·
27240 (1) ·
27760 (1) ·
30362 (1) ·
32445 (1) ·
33486 (1) ·
47712 (1) ·
5899 (1)
Showing below up to 18 results in range #1 to #18.