Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'Deer Wildlife Crossing ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I 95 SR 9 ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lake Ashby Canal ' (1) ·
'Lateral A Canal ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 Fl. Tpk ' (1) ·
'SR-91 N/S TPK ' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
'St. Johns River Relief ' (1)
'Australian Ave. ' (1) ·
'Congress Avenue ' (1) ·
'CR-630 (41st St.) ' (1) ·
'EB 706 To SB I-95 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'Maytown Road ' (1) ·
'NB SR-615 ' (1) ·
'SB SR-615 ' (1) ·
'SR 400 WB ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR-400 ' (1) ·
'SR-415 ' (1) ·
'SR70 EB Okeechobee' (1) ·
'SR70 WB Okeechobee' (1) ·
'SR786 WB to SB I95' (1) ·
'SR91 On/Off Rmp106' (1)
790205 (1) ·
790207 (1) ·
790220 (1) ·
794139 (1) ·
794141 (1) ·
884104 (1) ·
930384 (1) ·
930388 (1) ·
930457 (1) ·
930459 (1) ·
930488 (1) ·
930489 (1) ·
930525 (1) ·
930528 (1) ·
930529 (1) ·
931011 (1) ·
940136 (1) ·
940146 (1) ·
940147 (1) ·
940157 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1mi. West of CR-613 ' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'4.8 miles East of SR-415 ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'Between SR704 and 12th St' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'North of P. Beach Airport' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'SR-415 -St. Johns Relief ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
1068 (1) ·
12405 (1) ·
125788 (1) ·
130993 (1) ·
137065 (1) ·
14921 (1) ·
15875 (1) ·
198658 (1) ·
22555 (1) ·
23596 (1) ·
33486 (1) ·
47712 (1) ·
50315 (1) ·
560 (1) ·
5639 (1) ·
580 (1)
Showing below up to 20 results in range #1 to #20.