Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Place 004:
Wellington village
& Kind 043a :
Concrete continuous or
Prestressed concrete
Use the filters below to narrow your results.
930514 (1) ·
934212 (1) ·
934213 (1) ·
934292 (1) ·
934293 (1) ·
934299 (1) ·
934301 (1) ·
934327 (1) ·
934349 (1) ·
935920 (1)
'1.7 mi. east of SR-7 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'AT SR-80 ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'At US-441 Southern Blvd ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'South Side of US-98 ' (1) ·
'StriblingWay ovr E-1canal' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)