Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOLLES CANAL (L-21) ' (1) ·
'BOYNTON CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'Canal L-14 ' (1) ·
'E-1 Canal ' (1) ·
'E-3 Canal ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I-95 ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'L-14 CANAL ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Summit Boulevard ' (1)
'45TH STREET ' (1) ·
'Atlantic Ave. ' (1) ·
'Boynton Beach Blvd' (1) ·
'Congress Ave. ' (1) ·
'JOG ROAD ' (1) ·
'Malabar Rd ' (1) ·
'Minton Rd. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Pineda Causeway ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'US-27 (SR-25) ' (1) ·
'West Atlantic Ave.' (1)
700225 (1) ·
704143 (1) ·
705953 (1) ·
930163 (1) ·
930215 (1) ·
930240 (1) ·
930292 (1) ·
930342 (1) ·
930457 (1) ·
930459 (1) ·
930463 (1) ·
930464 (1) ·
930525 (1) ·
930527 (1) ·
931009 (1) ·
931010 (1) ·
934100 (1) ·
934315 (1) ·
940142 (1)
'0.1 mi E of Minton Rd ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.0 MI SOUTH OF SR-806 ' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Boynton Bch Blvd at SR-7 ' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East of SR 7 on SR 806 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'Minton Road-I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'US-27 OVER BOLLES CANAL ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
122864 (1) ·
12318 (1) ·
125788 (1) ·
130993 (1) ·
13132 (1) ·
136198 (1) ·
137065 (1) ·
157712 (1) ·
171592 (1) ·
199525 (1) ·
23943 (1) ·
27760 (1) ·
27934 (1) ·
28194 (1) ·
44243 (1) ·
62460 (1) ·
74605 (1) ·
75472 (1) ·
93690 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)