Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Inspect Date 090: 12-17 & Scour 113: Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures

Use the filters below to narrow your results.

Status:
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Lanes 028a:
2 (1) · 4 (1) · 5 (1) · 6 (1)
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
Superstructure 059:
Substructure 060:
Inspect Date 090: (Click arrow to add another value)
Direction 102:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 16 results in range #1 to #16.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)