Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'BRITT CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Crane Creek ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'CROOKED CREEK ' (1) ·
'HALF MILE LAKE ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'MANATEE POCKET ' (1) ·
'ROEBUCK CREEK ' (1) ·
'ROY'S SWALE ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'WARNER CREEK ' (1) ·
I-95 (1)
'BRITT RD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'Dubber Road ' (1) ·
'Fountainhead Blvd.' (1) ·
'Fox Lake Rd. ' (1) ·
'HORSESHOE POINT RD' (1) ·
'HURON WAY ' (1) ·
'ISLAND WAY ' (1) ·
'LOCKS ROAD ' (1) ·
'MURPHY RD ' (1) ·
'NORFOLK BLVD. ' (1) ·
'Orange camp Rd. ' (1) ·
'OUSLEY FARMS ROAD ' (1) ·
'PINE LAKE ROAD ' (1) ·
'SE HARBOR ISLAND ' (1) ·
'SILVER FOX LANE ' (1) ·
'ST LUCIE BLVD ' (1) ·
'STAR ISLAND WAY ' (1) ·
'SW GREENRIDGE LANE' (1) ·
'Tomoka Farms Rd. ' (1) ·
'TROPICALIA AVE. ' (1) ·
Grant Rd. (1) ·
Micco Rd. (1)
700133 (1) ·
700157 (1) ·
700158 (1) ·
705601 (1) ·
705603 (1) ·
790105 (1) ·
790211 (1) ·
890101 (1) ·
890112 (1) ·
894000 (1) ·
894001 (1) ·
894014 (1) ·
894017 (1) ·
894018 (1) ·
894042 (1) ·
894044 (1) ·
894047 (1) ·
894048 (1) ·
894049 (1) ·
894050 (1) ·
894051 (1) ·
894052 (1) ·
934299 (1)
'0.1 mi E of Wickham Road ' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.25 Mi. West of SR-405 ' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'0.8Mi S of BRITT ROAD ' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'1Mi W of US-1 ' (1) ·
'At US-441 Southern Blvd ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
1.3 Mi. East of CR-507 (1) ·
1.9MI E of Babcock St. (1)
26405650 (1) ·
26583556 (1) ·
27023873 (1) ·
27044012 (1) ·
27044356 (1) ·
27044705 (1) ·
27060944 (1) ·
27062187 (1) ·
27084791 (1) ·
27085780 (1) ·
27090600 (1) ·
27091468 (1) ·
27112563 (1) ·
27132091 (1) ·
27134072 (1) ·
27140482 (1) ·
27522524 (1) ·
27552820 (1) ·
28042875 (1) ·
28070604 (1) ·
28350798 (1) ·
28590460 (1) ·
29090830 (1)
80075632 (1) ·
80080433 (1) ·
80080562 (1) ·
80112778 (1) ·
80120030 (1) ·
80140376 (1) ·
80142587 (1) ·
80142967 (1) ·
80161911 (1) ·
80162515 (1) ·
80162552 (1) ·
80170170 (1) ·
80170422 (1) ·
80175123 (1) ·
80183914 (1) ·
80310465 (1) ·
80352983 (1) ·
80360839 (1) ·
80373635 (1) ·
80401763 (1) ·
80510496 (1) ·
81045886 (1) ·
81145411 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.