Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
884019 (1) ·
884047 (1) ·
894019 (1) ·
894021 (1) ·
894048 (1) ·
930802 (1) ·
930803 (1) ·
930804 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1)
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'6.3MI S of SoBay at US-27' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.