Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'COUNTRY CLUB DRIVE' (1) ·
'CR-707(Citrus Ave)' (1) ·
'FLEMING STREET ' (1) ·
'MURPHY RD ' (1) ·
'Riverbend Park Rd ' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SILVER FOX LANE ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR510 Wabasso Road' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 134.32' (1)
790166 (1) ·
790167 (1) ·
880050 (1) ·
880051 (1) ·
880052 (1) ·
884053 (1) ·
885604 (1) ·
890068 (1) ·
890112 (1) ·
894003 (1) ·
894042 (1) ·
930142 (1) ·
934176 (1) ·
940047 (1)
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.2MI East of US-1 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.