Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'BESSEY CREEK ' (1) ·
'C-18 Canal ' (1) ·
'C-3 Canal ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'MAPLE CREEK ' (1) ·
'PHIPP CANAL ' (1) ·
'SR 710 & SCL RR ' (1) ·
'SR 91 TPK ' (1) ·
'WILLOUGHBY CREEK ' (1) ·
I-95 (1)
'CR-603-IND RIV BLV' (1) ·
'CR708 125.4 ' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'Fountainhead Blvd.' (1) ·
'Fox Lake Rd. ' (1) ·
'Island Way ' (1) ·
'Lake Ida Road ' (1) ·
'MAPP RD ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 N/S TPK 106.1' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'Tomoka Farms Rd. ' (1) ·
Grant Rd. (1)
700133 (1) ·
700158 (1) ·
705603 (1) ·
790105 (1) ·
884054 (1) ·
890079 (1) ·
890082 (1) ·
890085 (1) ·
890102 (1) ·
890119 (1) ·
894033 (1) ·
930159 (1) ·
930235 (1) ·
930239 (1) ·
930241 (1) ·
934177 (1) ·
934963 (1) ·
940050 (1)
'0.1 mi E of Wickham Road ' (1) ·
'0.1 MILE WEST OF I-95 ' (1) ·
'0.14MI N of Indiantown Rd' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.25 Mi. West of SR-405 ' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
1.3 Mi. East of CR-507 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.