Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
884047 (1) ·
890800 (1) ·
894014 (1) ·
894049 (1) ·
930801 (1) ·
930805 (1) ·
930806 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1)
'0.2 MI West of US-98 ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'300FT East of CR-717 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6.3MI S of SoBay at US-27' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)