Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'BRANCH OF C-44 CANAL ' (1) ·
'C-1 Canal ' (1) ·
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'COLLIER WATERWAY ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'Intracoastal Waterway ' (1) ·
'ROEBUCK CREEK ' (1) ·
'Salerno Creek ' (1) ·
'Troup Indiantown Canal ' (1) ·
'WARNER CREEK ' (1)
'BUCKSKIN TRAIL ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'E/B S.R. 704 ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'ENGLAR DRIVE ' (1) ·
'LOCKS ROAD ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'OUSLEY FARMS ROAD ' (1) ·
'Palm Bay Parkway ' (1) ·
'SE Ebbtide Ave. ' (1) ·
'SR A1A ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-A1A ' (1) ·
'TROPICALIA AVE. ' (1) ·
'US-98 SR700 US441 ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB Spanish River ' (1)
705924 (1) ·
880053 (1) ·
885603 (1) ·
890015 (1) ·
894050 (1) ·
894051 (1) ·
894052 (1) ·
894053 (1) ·
894055 (1) ·
930154 (1) ·
930226 (1) ·
930465 (1) ·
930506 (1) ·
930507 (1) ·
934179 (1) ·
934299 (1) ·
940003 (1) ·
940004 (1) ·
940085 (1)
'0.23 MI N FPL POWER PLANT' (1) ·
'0.25 Mile N of Center St.' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'At US-441 Southern Blvd ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'SR-700 CANAL POINT ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.