Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'HOOD RD 110.944 ' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91 SB TPK 91.26 ' (1)
930239 (1) ·
930241 (1) ·
930441 (1) ·
930447 (1) ·
931001 (1) ·
931002 (1) ·
931003 (1) ·
931004 (1) ·
931011 (1) ·
931012 (1) ·
940121 (1) ·
940135 (1)
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'SR 91 at Jupiter Interch ' (1) ·
'SR-710 TPK Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10250 (1) ·
10844 (1) ·
133595 (1) ·
136198 (1) ·
23596 (1) ·
2950 (1) ·
34960 (1) ·
68099 (1) ·
77034 (1) ·
82412 (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)