Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'CR 708 ' (1) ·
'CR 709 & FECRR ' (1) ·
'Dirksen Dr ' (1) ·
'Drainage Ditch ' (1) ·
'FECRR ' (1) ·
'Header Canal ' (1) ·
'I-4 ' (1) ·
'LATERAL CANAL A ' (1) ·
'Nova Canal ' (1) ·
'Nova Road Canal ' (1) ·
'Padgett Creek ' (1) ·
'SALERNO CREEK ' (1) ·
'SR 70 ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'St. Lucie Canal ' (1)
'26TH STREET ' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'I-4 EB ' (1) ·
'I-4 EB ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR-5 (US-1) ' (1) ·
'Sixth St. ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-44 ' (1) ·
'SR-472 WB ' (1) ·
'SR-5A ' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'WB SR 70 ' (1)
700002 (1) ·
700103 (1) ·
790099 (1) ·
790100 (1) ·
790149 (1) ·
790177 (1) ·
790190 (1) ·
795587 (1) ·
884061 (1) ·
890004 (1) ·
890087 (1) ·
890117 (1) ·
890118 (1) ·
890132 (1) ·
890133 (1) ·
894041 (1) ·
940115 (1) ·
940116 (1) ·
940119 (1) ·
940126 (1) ·
940127 (1) ·
940135 (1)
'.75 Mile South Midway Rd.' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1mi N of SR-76(Kanner Hw)' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'AT CR-615 - 66TH AVE ' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'N of Roosevelt Bridge ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'Sixth St. & Nova Rd Canal' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'SR-5A over Nova Canal ' (1)
27023771 (1) ·
27023967 (1) ·
27070958 (1) ·
27071400 (1) ·
27084441 (1) ·
27131030 (1) ·
27131050 (1) ·
27211679 (1) ·
27211974 (1) ·
27222475 (1) ·
27234232 (1) ·
27234592 (1) ·
27244459 (1) ·
27384653 (1) ·
28313962 (1) ·
28314033 (1) ·
28520760 (1) ·
28521801 (1) ·
28571929 (1) ·
29014148 (1) ·
29091610 (1) ·
29134537 (1)
80114936 (1) ·
80140214 (1) ·
80140445 (1) ·
80154440 (1) ·
80154590 (1) ·
80160809 (1) ·
80161732 (1) ·
80233923 (1) ·
80234014 (1) ·
80240662 (1) ·
80244973 (1) ·
80245174 (1) ·
80274670 (1) ·
80295022 (1) ·
80472690 (1) ·
80472715 (1) ·
80551845 (1) ·
81011090 (1) ·
81030833 (1) ·
81152767 (1) ·
81170324 (1) ·
81170942 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)