Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR712 MDWYRD 150.3' (1) ·
'E/B S.R. 704 ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'W/B S.R. 704 ' (1) ·
'WB Spanish River ' (1)
890066 (1) ·
890068 (1) ·
930142 (1) ·
930154 (1) ·
930226 (1) ·
930506 (1) ·
930507 (1) ·
940049 (1) ·
940050 (1) ·
940076 (1) ·
940082 (1) ·
940951 (1)
'0.37MI N OF SR-712 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'WB SR800.2Mi west of US-1' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)