Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'C-1 Canal ' (1) ·
'C-18 Canal ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'CAMINO CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'GARDEN CANAL ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lateral B Canal ' (1) ·
'Okeechobee Waterway ' (1) ·
'Salerno Creek ' (1) ·
'Thompson River ' (1) ·
'Troup Indiantown Canal ' (1) ·
Sebastian River (1)
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-714 Indian St. ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'E/B S.R. 704 ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'Military Trail ' (1) ·
'Palm Bay Parkway ' (1) ·
'SE Ebbtide Ave. ' (1) ·
'SR A1A ' (1) ·
'SR-A1A ' (1) ·
'SR806 Atlantic Ave' (1) ·
'US-98 SR700 US441 ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1) ·
'W/B S.R. 704 ' (1) ·
US-1 (1)
700224 (1) ·
704097 (1) ·
704098 (1) ·
705924 (1) ·
884071 (1) ·
894053 (1) ·
894055 (1) ·
894062 (1) ·
930069 (1) ·
930465 (1) ·
930506 (1) ·
930507 (1) ·
934138 (1) ·
934179 (1) ·
935206 (1) ·
935207 (1) ·
940003 (1) ·
940004 (1) ·
940085 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.1MI E of SW 9TH AVE ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.25 Mile N of Center St.' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'At CR-613 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'Just W. of Congress Ave.' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'SR-700 CANAL POINT ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1) ·
US-1 over Sebastian River (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.