Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Rd to SB I-95 ' (1) ·
'C-23 CANAL ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR-68 ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'Ten Mile Creek ' (1) ·
'WPB Drainage Canal ' (1)
890110 (1) ·
890111 (1) ·
890121 (1) ·
890122 (1) ·
930477 (1) ·
930478 (1) ·
930481 (1) ·
930484 (1) ·
930499 (1) ·
930540 (1) ·
940096 (1) ·
940097 (1) ·
940122 (1) ·
940123 (1)
'.5 miles South of SR-70 ' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 miles South of SR 806' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'Just North of SR70 on I95' (1) ·
'PBIA/I-95 Interchange ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)