Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-1 Canal ' (1) ·
'C-24 Canal ' (1) ·
'C-51 Canal ' (1) ·
'E3-canal ' (1) ·
'Eau Gallie River ' (1) ·
'El Rio Canal ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'L-5 Canal ' (1) ·
'N Fork Loxahatchee River' (1) ·
'Rio Mar Bay ' (1) ·
'ROY'S SWALE ' (1) ·
'S-5 Discharge Canal ' (1) ·
'Spruce Creek ' (1) ·
'SR 91 TPK ' (1)
'Apollo Boulevard ' (1) ·
'Bay Drive ' (1) ·
'Becker Rd. ' (1) ·
'Benoist Farms Rd ' (1) ·
'CR-4009 ' (1) ·
'Crosstown Parkway ' (1) ·
'Enterprise Rd. ' (1) ·
'HOOD RD 110.944 ' (1) ·
'Levee Road ' (1) ·
'Melaleuca Lane ' (1) ·
'Orange camp Rd. ' (1) ·
'Palm Bay Parkway ' (1) ·
'River Drive ' (1) ·
'SILVER FOX LANE ' (1) ·
'Spanish River Blvd' (1) ·
'TEQUESTA DRIVE ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1)
704097 (1) ·
704098 (1) ·
705604 (1) ·
705924 (1) ·
790191 (1) ·
790211 (1) ·
794193 (1) ·
885811 (1) ·
885812 (1) ·
894042 (1) ·
930441 (1) ·
930803 (1) ·
930804 (1) ·
930811 (1) ·
934361 (1) ·
934711 (1) ·
935222 (1) ·
936776 (1) ·
941001 (1) ·
945274 (1)
'0.1 Mile West of A1A ' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'100Ft. South of Bay Drive' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.