Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal ' (1) ·
'CR-515 & Indian River ' (1) ·
'Drainage Canal ' (1) ·
'Golf Cart Underpass ' (1) ·
'Indian River ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR 91 TPK ' (1) ·
'Thompson River ' (1) ·
'US-1 & FECRR ' (1) ·
Banana River Relief (1) ·
Indian River Relief East (1)
'Central Blvd. ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'EB SR 786 ' (1) ·
'HOOD RD 110.944 ' (1) ·
'LARCH AVE ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'Military Trail ' (1) ·
'S. Burnett Rd ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR-520 ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-710 ' (1) ·
'WB SR 786 ' (1) ·
SR-520 (1)
700015 (1) ·
700061 (1) ·
700108 (1) ·
700109 (1) ·
700137 (1) ·
700169 (1) ·
700192 (1) ·
700196 (1) ·
704193 (1) ·
930121 (1) ·
930381 (1) ·
930419 (1) ·
930441 (1) ·
930491 (1) ·
930492 (1) ·
930493 (1) ·
930526 (1) ·
934138 (1) ·
934175 (1) ·
937001 (1) ·
937007 (1)
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.5mi East of SR-786 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.95 MI N of PGA Blvd. ' (1) ·
'1.5 Mi East of I-95 ' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'1st overpass east of I-95' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'At Pluckebaum Rd ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-528 EB - US-1& FECRR ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
SR-520 - Banana River (1) ·
SR-520 - Indian River Relief (1)
26490539 (1) ·
26494457 (1) ·
26500886 (1) ·
26500997 (1) ·
26503600 (1) ·
26503900 (1) ·
26504600 (1) ·
26504915 (1) ·
26510969 (1) ·
26515528 (1) ·
26525829 (1) ·
26525885 (1) ·
28204418 (1) ·
28212071 (1) ·
28212281 (1) ·
28212382 (1) ·
28212408 (1) ·
28212829 (1) ·
28240078 (1) ·
28240428 (1) ·
28240489 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)