Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'AVENUE OF PGA ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CYPRESS WAY ' (1) ·
'ENGLAR DRIVE ' (1) ·
'Fifth Street ' (1) ·
'HICKORY DRIVE ' (1) ·
'LARCH AVE ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'NW 13 ST ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'ORANGE TREE DR ' (1) ·
'SE 7TH STREET ' (1) ·
'TROON DR ' (1)
795701 (1) ·
885603 (1) ·
934482 (1) ·
935001 (1) ·
935002 (1) ·
935100 (1) ·
935204 (1) ·
935206 (1) ·
935207 (1) ·
935215 (1) ·
935900 (1) ·
937001 (1) ·
937005 (1) ·
937006 (1) ·
937007 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.1 MI S of PGA BLVD ' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'0.1MI E of SW 9TH AVE ' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'200ft. W of A1A ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)