Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'I-4 ' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'SR 91 TPK (STUART INT) ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'SR-404 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'SR91 TPK (JUPITER INT) ' (1)
'I 95 to PBIA Ramp ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR-472 EB ' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-1 NB ' (1)
700141 (1) ·
790053 (1) ·
890068 (1) ·
930142 (1) ·
930450 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
931012 (1) ·
940053 (1) ·
940121 (1)
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR 91 at Jupiter Interch ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'US-1 NB - SR-404 ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)