Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR-707(Citrus Ave)' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'DAVIS ROAD ' (1) ·
'Fountainhead Blvd.' (1) ·
'Fox Lake Rd. ' (1) ·
'MAPP RD ' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'Tomoka Farms Rd. ' (1) ·
Grant Rd. (1)
700015 (1) ·
700133 (1) ·
700140 (1) ·
700158 (1) ·
705603 (1) ·
790105 (1) ·
790166 (1) ·
790167 (1) ·
890102 (1) ·
894033 (1) ·
930493 (1) ·
937202 (1) ·
940047 (1) ·
940050 (1)
'0.1 mi E of Wickham Road ' (1) ·
'0.25 Mi. West of SR-405 ' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-528 EB - SR-401 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
1.3 Mi. East of CR-507 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.