Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'Clint Moore Road ' (1) ·
'DRAINAGE CANAL ' (1) ·
'DRAINAGE DITCH ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'SR 91 TPK (STUART INT) ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'SR-91 N/S TPK ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'SR91 TPK (JUPITER INT) ' (1) ·
'ST LUCIE CANAL ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'SR 91 TPK SB 131.0' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR-91 TPK NB 131.0' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 127.3' (1) ·
'SR91 N/S TPK 139.7' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'SR91SB ON/OFF 98.0' (1)
890066 (1) ·
890068 (1) ·
890077 (1) ·
891000 (1) ·
930241 (1) ·
930450 (1) ·
931000 (1) ·
931004 (1) ·
931005 (1) ·
931006 (1) ·
931009 (1) ·
931010 (1) ·
931011 (1) ·
931012 (1) ·
940061 (1)
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'1.6 MI N OF MARTIN CO ' (1) ·
'1.8MI NORTH OF SR-708 ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'500' N OF SR-80 (S.BLVD) ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'SR 91 at Jupiter Interch ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'STUART TPK INTERCHANGE ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10844 (1) ·
10930 (1) ·
11538 (1) ·
133595 (1) ·
136198 (1) ·
157712 (1) ·
171592 (1) ·
23596 (1) ·
2689 (1) ·
38517 (1) ·
77034 (1) ·
84378 (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)