Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service Under 042b:
Waterway
& Kind 043a:
Concrete continuous
& Inspect Date 090:
10-16
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'Berrys Canal ' (1) ·
'Canal - D ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'Lateral A Canal ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek N Relief ' (1) ·
'Spruce Creek N. Relief ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'WILLOUGHBY CREEK ' (1) ·
Six Mile Creek (1)
700194 (1) ·
790149 (1) ·
790155 (1) ·
790156 (1) ·
790157 (1) ·
790158 (1) ·
790159 (1) ·
790160 (1) ·
884104 (1) ·
894040 (1) ·
894044 (1) ·
930402 (1) ·
940136 (1) ·
940143 (1) ·
940146 (1) ·
940147 (1) ·
940157 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1mi. West of CR-613 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'US-1 NB - Spruce Cr. S. ' (1) ·
'US-1 NB - Spruce Creek ' (1) ·
'US-1 SB - Spruce Creek ' (1) ·
'US-1 SB-Spruce Creek ' (1) ·
'US-1SB - Spruce Cr. S. ' (1) ·
SR-46 over Six Mile Cr (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)