Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'Jupiter Creek ' (1) ·
'South Relief Canal ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'ST LUCIE CANAL ' (1) ·
'Turkey Creek ' (1) ·
'WB SR 80 ' (1) ·
Banana River Relief (1) ·
Horse Creek (1)
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'Indiantown Road ' (1) ·
'JOG ROAD ' (1) ·
'NB SR 807 ' (1) ·
'SB SR 807 ' (1) ·
'SR 400 WB ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-400 ' (1) ·
'SR-808 Glades Road' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) ' (1) ·
SR-520 (1) ·
US-1 (1)
700192 (1) ·
700203 (1) ·
700206 (1) ·
790205 (1) ·
790207 (1) ·
790247 (1) ·
880089 (1) ·
890066 (1) ·
930381 (1) ·
930414 (1) ·
930415 (1) ·
930419 (1) ·
930420 (1) ·
930450 (1) ·
930475 (1) ·
930476 (1) ·
930532 (1) ·
930533 (1) ·
934297 (1)
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'US-1 over Turkey Creek ' (1) ·
SR-520 - Banana River (1) ·
US-1 over Horse Creek (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)