Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'Belvedere Road ' (1) ·
'EPB - 10 Canal ' (1) ·
'I 95 and SR 704 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Intracoastal Waterway ' (1) ·
'Loxahatchee River ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'Summit Boulevard ' (1) ·
'SWA Retention Canal ' (1) ·
'WPB Drainage Canal ' (1)
'Belvede to NB I-95' (1) ·
'Congress Avenue ' (1) ·
'E/B S.R. 704 ' (1) ·
'Haverhill Road ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'I-95 (SR 9) ' (1) ·
'Jog Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PBIA to SB I-95 ' (1) ·
'Riverbend Park Rd ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'Southern Boulevard' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 SB TPK 100.15' (1) ·
'W/B S.R. 704 ' (1) ·
'WB SR704 to SB I95' (1)
930097 (1) ·
930142 (1) ·
930235 (1) ·
930291 (1) ·
930292 (1) ·
930469 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1) ·
930485 (1) ·
930486 (1) ·
930487 (1) ·
930494 (1) ·
930506 (1) ·
930507 (1) ·
930528 (1) ·
930540 (1) ·
934158 (1) ·
934171 (1) ·
934176 (1)
'.5MI W of A1A & E of SR-5' (1) ·
'0.3 Mi N of 45th St ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1 mile North of SR 80 ' (1) ·
'2.6 Mi. S of SR-710 ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'Between SR704 and 12th St' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'I-95 SR 704 interchange ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'North of Belvedere Rd ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
26395750 (1) ·
26403161 (1) ·
26404904 (1) ·
26405302 (1) ·
26411352 (1) ·
26411700 (1) ·
26412225 (1) ·
26412326 (1) ·
26412375 (1) ·
26412530 (1) ·
26412597 (1) ·
26412600 (1) ·
26413650 (1) ·
26413700 (1) ·
26422200 (1) ·
26422570 (1) ·
26423954 (1) ·
26424967 (1) ·
26440030 (1) ·
26450626 (1) ·
26454160 (1) ·
26455503 (1) ·
26555800 (1)
80024000 (1) ·
80025300 (1) ·
80025423 (1) ·
80035976 (1) ·
80040125 (1) ·
80040300 (1) ·
80040450 (1) ·
80040574 (1) ·
80040575 (1) ·
80040933 (1) ·
80041000 (1) ·
80041281 (1) ·
80041480 (1) ·
80041600 (1) ·
80041660 (1) ·
80042465 (1) ·
80042805 (1) ·
80043790 (1) ·
80050018 (1) ·
80052775 (1) ·
80065835 (1) ·
80080366 (1) ·
80081956 (1) ·
80082890 (1) ·
80104200 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
10063 (1) ·
10875 (1) ·
119194 (1) ·
12666 (1) ·
17350 (1) ·
198658 (1) ·
19952 (1) ·
199525 (1) ·
20574 (1) ·
20994 (1) ·
22121 (1) ·
27760 (1) ·
30362 (1) ·
33486 (1) ·
369555 (1) ·
5899 (1) ·
625 (1) ·
8328 (1) ·
8415 (1) ·
9196 (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)