Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'JOANN CANAL ' (1) ·
'L-5 Canal ' (1) ·
'LATERAL A CANAL ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD E-4 Canal ' (1) ·
'Palmetto Park Road ' (1) ·
'RANGE LINE CANAL ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'TEN MILE CREEK ' (1) ·
'TIDAL CANAL ' (1)
'BEL LIDO DRIVE ' (1) ·
'CAMINO GARDENS EB ' (1) ·
'CAMINO GARDENS WB ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'HURON WAY ' (1) ·
'I 95 SB ' (1) ·
'Levee Road ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'Quantum Blvd. ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SIMARA STREET ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR91 N/S TPK 152.5' (1)
880044 (1) ·
884019 (1) ·
884027 (1) ·
884028 (1) ·
884039 (1) ·
894019 (1) ·
894021 (1) ·
894048 (1) ·
895504 (1) ·
930188 (1) ·
930802 (1) ·
930803 (1) ·
930804 (1) ·
935209 (1) ·
935210 (1) ·
935507 (1) ·
935900 (1) ·
936375 (1) ·
940072 (1) ·
940152 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.19Mi. E of Congress Ave' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.6 Mile West of US-27 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'1MI W OF CR-615 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200ft. W of A1A ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'6.0 Mi. West of US-27 ' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'Boca Raton ' (1) ·
'CR-615 (66TH AVE.) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.