Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
880044 (1) ·
884019 (1) ·
884027 (1) ·
884028 (1) ·
884039 (1) ·
894021 (1) ·
894048 (1) ·
895504 (1) ·
930940 (1) ·
935301 (1) ·
935302 (1) ·
935306 (1) ·
935900 (1)
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI S OF OLD BOYNTON ' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'1MI W OF CR-615 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200ft. W of A1A ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'650FT E OF SEWALLS PT. RD' (1) ·
'CR-615 (66TH AVE.) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)