Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Inspect Date 090:
08-17
& Scour 113:
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips.
Use the filters below to narrow your results.
795701 (1) ·
890093 (1) ·
890107 (1) ·
930005 (1) ·
930097 (1) ·
930154 (1) ·
930226 (1) ·
930339 (1) ·
934908 (1) ·
940001 (1)
'.3 m N of Martin Co. line' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.5 Mile West of SR-76 ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'City of Jupiter ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)