Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CAMINO CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'E-1 CANAL ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'El Rio Canal ' (1) ·
'GARDEN CANAL ' (1) ·
'JOANN CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'Lateral H Canal ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'RANGE LINE CANAL ' (1) ·
'SALERNO CREEK ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'WPB Drainage Canal ' (1)
'53rd Street ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CYPRESS WAY ' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'I-95 (SR 9) ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'S. LAKE DRIVE ' (1) ·
'Spanish River Blvd' (1) ·
'SW GREENRIDGE LANE' (1)
880047 (1) ·
884027 (1) ·
884028 (1) ·
884038 (1) ·
884083 (1) ·
894041 (1) ·
894049 (1) ·
930540 (1) ·
934420 (1) ·
934421 (1) ·
934922 (1) ·
934923 (1) ·
935204 (1) ·
935205 (1) ·
935206 (1) ·
935207 (1) ·
935222 (1) ·
935303 (1) ·
935507 (1)
'0.1MI E of SW 9TH AVE ' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.1MI Wof CR-615(66th St)' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'1MI W OF CR-615 ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'3MI W OF CR-615 ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'AT SALERNO ROAD AND A1A ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)